Description Of Work: Tore off entire main roof to wood. He supplied and installed G A F Timberline H D roof to include weather watch. Cobra attic vent and starter strip shingles, and Ridge Cap Shingles. My front overhang roof was covered with the shingles also. We had plywood replaced on entire one side of house. It was 60 years old. He also installed a new attic fan. The color I chose was Williamsburg Slate.
Joe was a pleasure from the very start. He was the second of three bids. I chose him from Angie’s list. When I called to set up initial appointment we made a date and time. He called to tell us he was on his way. He was on time as promised. He took time with us, explained all the GAF products. We were unsure of the ridge vent, so he spent even more time explaining the product so that we clearly understood, so that we would be able to make an informed decision. We reviewed each of the bids and decided to go with Joe. We signed the contract in January, due to the weather we did the work April 12th,2014. The day was beautiful and warm. Joe called and let us know what to expect. The dumpster was delivered Saturday at 6:30 am. The crew showed up at 8. They were amazing!!!! Angel was the Forman. His crew worked well together, efficient , coordinated and clean. Joe came by to check on the job. They finished at 4:45pm. I am very happy with the entire process from beginning to end. I have to thank Joe and his crew for a job very well done!!