February 18, 2013

Description Of Work: Five windows were replaced, Four window sills were replaced, One bathroom window frame was replaced

The work lasted two days. The  workers performed a meticulous job on replacing the windows. I had used them previously for windows and they did a good job on the installation. The frame in the bathroom was supposed to be a tile frame. However with the previous owner’s installation of the bathroom window being a less than stellar job; the tile work turned out to be a larger task than the quoted price. We reached an agreement on a metal frame installation with some changes to the existing tiles. The workers did a good job with the proposed changes.The window sill installation caused a small amount of damage on my newly built PVC decking. The acknowledged their mistake and replaced the piece of decking that was damaged. It was minor damage but they fixed it knowing that it was a newly built deck.